Partially installed hardware
Video of the interior of a modular container with partially installed hardware.
View the container →Part of the IDEAL STAV CAPITAL group
We are acquiring and will operate a mobile containerised AI data centre — the first Czech node of the DCNetwork network. Electricity is secured by contract directly at the source, and the node’s capacity is fully contracted before deployment.
We do not build on renderings. The technology, power systems and cooling are real — see photos and video directly from the site.
Construction of the data centre is handled by IDEAL STAV, a construction company building on industry experience dating back to 2008.
stavebni.idealstav.com ↗DCNetwork will handle the data centre’s utilisation, management and technology operations.
DCNETWORK.IO ↗Imagine a building full of ultra-powerful computers, continuously processing data for banks, the government, artificial intelligence and large companies. We are building just such a digital factory in Czechia — and opening it up to retail investors too.
It is a secure building with thousands of servers, cooling and its own connection to the power grid. Simply put, a factory that produces computing power and data storage instead of physical goods.
Data centre capacity is leased under long-term contracts before operations even begin. This means predictable cash flow, growing demand for AI computing and low operating costs thanks to low-cost energy sourced directly at its source.
Banks, government institutions, online stores and AI companies need to securely store and process vast amounts of data. A Czech location is strategic: we are in the centre of Europe, with a stable legal environment and a high-quality network.
Video of the interior of a modular container with partially installed hardware.
View the container →Turnkey containerised data centre: 12 racks, patented air cooling with a PUE of 1.07 and a power envelope of ≈1 MW. Located directly at the energy source — deployment in months, not years.
A server configuration with NVIDIA B200 GPUs and the complete DCNetwork software platform. The network automatically routes paying users to the node and provides continuous monitoring and servicing.
The node’s capacity was fully contracted through the DCNetwork network’s sales channel before its deployment. The bond issue thus finances capacity that has already been sold. We make the contractual documentation available to qualified investors in the data room after an NDA is signed.
The project's key elements — location, power, hardware and sales — are secured by contract. We make sensitive documents available to qualified investors in the data room after signing an NDA.
The site and electricity connection are secured by contract at a power generation facility in the Czech Republic.
100 % of the node's capacity has been sold through the DCNetwork sales channel.
Turnkey server system and container at a fixed price agreed upon signing.
DCNetwork Service provides node operation, monitoring and maintenance.
Data processing within the Czech Republic in compliance with GDPR.
Complete contractual documentation for qualified investors after signing an NDA.
The acquisition of the node is financed by the secured bond issue Ideal Stav Data 12/29, ISIN CZ0003585960. The bonds are secured by a future pledge over the DCNetwork mobile data container, including GPU servers and technological equipment, up to an amount of 156 400 000 CZK. This right is recorded in the Pledge Register on the basis of a notarial deed dated 23. 9. 2026 — see the documents below. Investors' rights under the security are protected by the security agent, the law firm Blockchain Legal.
Security agentThe bonds carry a fixed yield of up to 12 % p.a. paid monthly (10 % p.a. in year 1, 12 % p.a. in years 2 and 3; 12 % p.a. throughout the term if early redemption is waived) and mature on 5. 8. 2029. Both the minimum investment and the nominal value of one bond are 50 000 CZK. The anticipated total nominal value of the issue is 115 000 000 CZK.
This is an illustrative investment example only. We offer two alternative scenarios: Flexi (10% p.a. in the first year, 12% p.a. in subsequent years, with the option to withdraw after one year) and Fix 3 years (12% p.a. throughout the term, with no early withdrawal). The binding terms are set out in the terms and conditions of the IDEAL STAV DATA bond issue.
Indicative calculation of gross return before tax — interest income of individuals who are Czech tax residents is subject to 15% withholding tax. Investing in bonds carries the risk of losing part or all of the amount invested.

We are building a data centre because we believe that the future of Czech digital infrastructure must rest on foundations of its own that are secure and scalable. Combining our family’s construction tradition with the technology powering artificial intelligence is a natural step for us.
IDEAL STAV DATA builds on the legacy of the family-owned construction group IDEAL STAV 2008. More than a hundred completed construction projects, a stable team and sound financial indicators form the foundation on which we are building a new-generation data centre.
Small but essential facts about data centres, energy and AI computing — the details that usually do not make it into a press release.
This is a marketing communication concerning a public offering of bonds.
The company Ideal Stav Data a.s., company identification number 297 79 626, LEI: 315700SLUI6UTJ5CFB19, with its registered office at Jaurisova 515/4, Michle, 140 00 Praha 4 (the “Issuer”), is issuing certificated bonds payable to order named “Ideal Stav Data 12/29”, ISIN CZ0003585960 (the “Bonds”).
The anticipated aggregate nominal value of the issue is 115 000 000 CZK. The nominal value and issue price of each Bond are 50 000 CZK. The issue date is 5. 8. 2026 and the final maturity date is 5. 8. 2029.
The Bonds constitute secured and unsubordinated obligations of the Issuer. The security is a future pledge over a DCNetwork (Config A-Start) mobile data container, including GPU servers and other equipment, securing debts up to an aggregate principal amount of 156 400 000 CZK. The security agent is Blockchain Legal, advokátní kancelář s. r. o. The Bonds will not be admitted to trading on a regulated market or a multilateral trading facility, and neither the Issuer nor the Bonds have been assigned a rating.
No prospectus has been prepared for the public offering of the Bonds or approved by the Czech National Bank or the supervisory authority of another European Union Member State. The public offering is being conducted under a regime in which publication of a prospectus is not required in view of its total value. The Issue Document is not a prospectus and has neither been approved nor reviewed by the Czech National Bank.
The Terms and Conditions of the Bonds and the Issue Document are available electronically on the Issuer’s website data.idealstav.com:
Before making an investment decision, a potential investor should familiarise themselves with the Terms and Conditions of the Bonds and the Issue Document in their entirety, particularly the risk factors set out therein, and independently assess the risks and suitability of an investment in the Bonds. This marketing communication does not replace the Terms and Conditions of the Bonds or the Issue Document.
Warning! Neither the Czech National Bank nor any other public authority has assessed the Issuer’s financial health or business plan, and they do not guarantee the Issuer’s future profitability or its ability to repay its obligations under the Bond.