We are preparing a bond issue to finance the node
The issue finances the acquisition of a data node. The binding parameters are set out in the terms and conditions of the issue.
The bond issue is now secured by a pledge over a DCNetwork mobile data container with GPU servers, up to an amount of CZK 156 400 000. The interest rate of up to 12% p.a. remains unchanged.
Read the full article
An example of a modular container with hardware partially installed. This is what a data centre’s basic building block looks like during the installation of computing units and network infrastructure.
Read the full article
How we dissipate heat even from dense AI workloads without liquid circuits or water consumption — and what this means for operating costs and the surrounding area.
Read the full article
A full report from the construction site — the hall, power supply, cooling, cabling and gas fire suppression. The project is co-financed by the European Union.
Read the full articleThe issue finances the acquisition of a data node. The binding parameters are set out in the terms and conditions of the issue.